Nantong-Shuttle
NanTong,China
4-story Shuttle Parking Garage in Nantong Development Zone, equipped with 102 dedicated parking spaces. It features high access efficiency, energy conservation and stable operation, building a one-stop smart parking ecosystem.
Completed:2015

INTRODUCTION
This project is a shuttle parking garage located on Chenyang Road, Nantong Development Zone. Centered on 102 stereo parking spaces (including 18 SUV parking spaces and 84 compact car parking spaces), it integrates telescopic comb-tooth handling technology and cloud intelligent control ecosystem to build the first Yangtze River Delta smart service station integrating parking, charging and rest. Relying on the independent technical matrix of CoPARK, it realizes vehicle access within 90 seconds with rapid response. The daily traffic throughput exceeds 800 vehicle trips, and the land utilization rate is 4 times higher than that of conventional ground parking.
FEATURES
Dual servo coordinated control for traversing trolleys and carriers increases operating speed by 30% and reduces noise by 15 decibels.
Intelligent linkage between DC fast charging piles and vehicle access routes supports reservation charging with no queuing.
Intelligent fault isolation system: local faults are automatically shielded to ensure the continuous operation of over 85% of parking spaces, and the maintenance response time is shortened to 15 minutes.
The CoPARK-Cloud intelligent parking cloud platform monitors 132 key equipment parameters in real time, enabling predictive maintenance and energy consumption optimization.
The smart service station integrates scenario-based services such as facial recognition/QR code vehicle retrieval, lounge waiting area, and charging progress inquiry, cutting user staying time by 60%.